The Field School

Project Details

Project Name
The Field School
Location
16 Alphabet LaneWestonMA02493
Project Types
Education
Project Scope
New Construction
Shared By
Jonathan Levi Architects
Project Status
Built
Year Completed
2015
Size
65,000 ft²
Team
Principal in Charge: Jonathan Levi, FAIA

Project Description

Pierced by a new north-south pedestrian walkway the new school connects two sister ‘feeder’ schools to the north with a shared amphitheater and shared playfields. The overall building orientation combined with the specialized envelope maximizes daylighting of the classrooms and minimizes unequal heating and cooling loads. A sloped site section was employed to create a walkout basement which minimizes the bulk of the gymnasium. The Field’s innovative collaborative teaching culture inspired a quality of openness – with programmed use of public spaces and the visible celebration of student learning and achievement. This is evident in the numerous ‘break-out’ or public student project spaces distributed through the building.

Upcoming Events

  • Lighten the Load: Structural Efficiency in Mid-Rise & High-Rise Design

    Live Webinar

    Register for Free
  • Charlotte Dealmakers

    Sonesta Charlotte Lower South End

    Register Now
  • Columbus Dealmakers

    Renaissance Columbus Downtown Hotel

    Register Now
All Events