Campbell Ewald Headquarters

Project Details

Project Name
Campbell Ewald Headquarters
Location
2000 Brush StreetSuite 601DetroitMIUSA48226
Project Types
Shared By
Sarah Stalter
Project Status
Built
Year Completed
2014
Size
122,000 ft²

Project Description

The advertising agency had looked at several other options for the relocation of its headquarters before falling in love with the "bones" of the former J.L. Hudson warehouse attached to Ford Field. The warehouse combines multiple structural systems with clay tile and board-formed concrete and steel deck ceilings, all called out to be exposed.

The scope of work includes five full floors with a five story atrium cut out of the upper four floors, all new mechanical and electrical, and a new computer room with dedicated UPS, HVAC and backup generator.

The offices feature benching furniture configurations and minimal fixed rooms. The design also “embraces the ugly” by making creative use of recycled materials including pallets, 500 doors sliced up into slatted partition pods, and conduits used as room dividers. A four-story LED screen with the ability to add messaging provides visual impact. LED lighting, new bathrooms, kitchenettes and some highly designed “pitch rooms” round out the program.

Upcoming Events

  • Lighten the Load: Structural Efficiency in Mid-Rise & High-Rise Design

    Live Webinar

    Register for Free
  • Charlotte Dealmakers

    Sonesta Charlotte Lower South End

    Register Now
  • Columbus Dealmakers

    Renaissance Columbus Downtown Hotel

    Register Now
All Events