White House Gets Carpet and HVAC System Upgrades

Images show changes in the West Wing Lobby, the Roosevelt Room, the Rose Garden sitting area, and the Oval Office.

1 MIN READ

President Donald Trump has returned to his Washington, D.C., live/work space following a weeks-long renovation of the building. Images circulating online show changes to the White House’s West Wing Lobby, the Roosevelt Room, the Rose Garden sitting area, and the Oval Office.

A General Services Administration spokesperson told CNN’s Betsy Klein that the HVAC upgrade, approved during President Barack Obama’s time in office, cost $1.965 million, the painting cost $275,000, and replacing the carpet cost $1.17 million. Klein reports that the Trump administration requested that all materials were made in the United States: “Limestone in the new steps on the South Portico came from Indiana, and the Oval Office wallpaper hails from York, Pennsylvania. The HVAC contractor was Calvary Mechanical Co. Inc., and the carpet contractor was Microbase Corp., both of which are minority-owned small businesses.”

About the Author

Sara Johnson

Sara Johnson is the former associate editor, design news at ARCHITECT. Previously, she was a fellow at CityLab. Her work has also appeared in San Francisco, San Francisco Brides, California Brides, DCist, Patchwork Nation, and The Christian Science Monitor.

No recommended contents to display.

Upcoming Events

  • Lighten the Load: Structural Efficiency in Mid-Rise & High-Rise Design

    Live Webinar

    Register for Free
  • Charlotte Dealmakers

    Sonesta Charlotte Lower South End

    Register Now
  • Columbus Dealmakers

    Renaissance Columbus Downtown Hotel

    Register Now
All Events