Fuller Middle School

Project Details

Project Name
Fuller Middle School
Location
31 Flagg Dr FraminghamMA01702
Project Types
Education
Project Scope
New Construction
Shared By
Jonathan Levi Architects
Project Status
Built
Year Completed
2021
Size
137,000 ft²
Team
Principal in Charge: Jonathan Levi, FAIA
Project Manager : Philip Gray, AIA
Project Manager: Mark Warner, AIA
Project Architect: Elizabeth Bugbee, AIA

Project Description

Fuller Middle School provides students the flexible, expansive space to build upon the preparatory STEAM education pedagogies Framingham students experience in elementary school. A three-story Learning Commons, paired classroom suites with shared teacher planning offices to promote team teaching, and flexible indoor and outdoor gathering areas bring together the entire academic community, showcasing project-based learning and inspiring creativity and collaboration. Forwarding the broader community’s goal of creating a new civic focus for South Framingham, the building is set back beyond a sloped outdoor amphitheater with a performance shell, serving as a gathering lawn for students and venue for town-wide events and performances.

Upcoming Events

  • Lighten the Load: Structural Efficiency in Mid-Rise & High-Rise Design

    Live Webinar

    Register for Free
  • Charlotte Dealmakers

    Sonesta Charlotte Lower South End

    Register Now
  • Columbus Dealmakers

    Renaissance Columbus Downtown Hotel

    Register Now
All Events