Treadmark

Project Details

Project Name
Treadmark
Location
DorchesterMA
Project Scope
New Construction
Shared By
kmargeson1
Project Status
Built
Year Completed
2019
Size
99,385 ft²

Project Description

Treadmark is an 83 unit six-story sustainable TOD structure that maintains a strong visual connection to the former Ashmont Tire auto shop it replaced. The $45M mixed-use, mixed-income building is enveloped in gray ironspot brickwork interspersed with clean, vertical aluminum panels that give the structure a distinctly modern feel. Stylistically, the exterior’s straight edges and angular corners set the building apart from the surrounding redbrick landscape. Large, garage-bay-style openings on the ground floor lead foot-traffic into the sizable 5,000 square foot retail spaces: another aesthetic and functional nod to the site’s industrial roots.

Inspired by early 20th Century factory architecture, Treadmark strikes a modern figure against the brick-stone backdrop of Peabody Square, will add vibrancy to the surrounding neighborhood and is conveniently located at the southern end of the MBTA’s Red Line, at Ashmont Station. Interiors by celebrity designer, Taniya Nayak.

Upcoming Events

  • Lighten the Load: Structural Efficiency in Mid-Rise & High-Rise Design

    Live Webinar

    Register for Free
  • Charlotte Dealmakers

    Sonesta Charlotte Lower South End

    Register Now
  • Columbus Dealmakers

    Renaissance Columbus Downtown Hotel

    Register Now
All Events